Project background

A power plant requires condensate treatment. Due to the preceding process it cannot be excluded that organic matter is contained in the raw condensate.

  PW Kondensataufbereitung Beitrag

Goal and challenge

From the raw condensate pure condensate according to VGB-S-010-T-00 with a conductivity < 0,20 µS/cm shall be obtained. In addition, the organic matter contained in the raw condensate should be reliably separated in order not to disturb the ion exchange process.

Concept and implementation

To achieve the desired pure condensate quality, the raw condensate must be cooled to process temperature in a first step. A highly efficient heat displacement system is used for this purpose, which minimises temperature losses during condensate preparation. To protect the ion exchange resins from organic matter, an activated carbon filter was provided. Downstream are cation exchangers to remove ammonia from the raw condensate and mixed bed ion exchange exchangers to remove residual ions. 

Customer benefits

  • Reliable compliance with the required pure condensate quality according to VGB-S-010-T-00 with a conductivity < 0,20 µS/cm independent of qualitative fluctuations of the raw condensate
  • Realisation of the plant including neutralisation and regeneration stations by a system provider
  • High reliability of condensate treatment through coordination of the processes by a system provider
 

Facts and figures

 Commissioning:   2014
 Plant capacitiy:   220 m³/h
 feed medium:   raw condensate

 

 

 

Process:

Icon Ionenaustauschverfahren FINAL      
Ion Exchanger      

 

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.